Shanghai Chunyu Foundation Pit Project

Date:2024-04-02

Shanghai Chunyu Foundation Pit Project

The foundation pit of this project adopts underground continuous walls with thicknesses of 1000mm and 1200mm. The depth of the ground wall is 43.7m to 55.16m. Four reinforced concrete supports are provided. The third and fourth concrete supports are equipped with servo jacks adjacent to the Jinsan Branch Road. Set up 1 to 2 supports in local deep pits, the first one is concrete support, and the second one is steel support. The total area of the foundation pit is 29,600 m2, and the general excavation depth is 20.75m. The excavation depth of the foundation pit in the cap area is 21.15m, and the excavation depth in the tower area is 23.35m~32.05m.

Automated monitoring equipment

Device name:Inclino-Robot IRA

Model:IRA-60

Quantity:14 Sets

Hole Depth:46-50m

Starting Method:Starting from the orifice

Life Cycle:2023.12-2024.05

Installation Pictures

Inclino-Robot2

Data Display

WX20240407-005336@2x

T4

WX20240407-005419@2x

Monitoring data for different time periods at the same site

WX20240407-005455@2x

CX4

WX20240407-005522@2x
WX20240407-005612@2x
Other Cases

Hangzhou Convention and Exhibition Foundation Pit Project

Project Overview:The 330kV power transmission ...
Read More >>

Shanghai Chunyu Foundation Pit Project

Shanghai Chunyu Foundation Pit ProjectThe foun...
Read More >>

Gujiaqiao foundation pit project

Automated monitoring equipmentDevice name:Incl...
Read More >>

-  Contact Us -