Project Overview:
The 330kV power transmission substation is located at the northwest corner of the intersection of Wenyi Road. The substation has a rectangular layout, with the main structure located underground. The roof is planned to be covered with soil with a thickness of about 1m. It is a reinforced concrete structure with three floors underground and one floor above ground, with a burial depth of about 19m. The foundation pit support adopts the reinforced concrete pile + pre-stressed jet grouting anchor cable support type. The diameter of the pile is 1.0m, and the length of a single pile is about 33 meters.
Automated monitoring equipment
Device name:Inclino-Robot IRA
Model:IRA-45
Quantity:1 Sets
Hole Depth:32m
Starting Method:Starting from the orifice
Life Cycle:2023.06-2024.02
Installation Pictures
Data Display
Monitoring data from the same measuring point in different time periods