Hangzhou Convention and Exhibition Foundation Pit Project

Date:2024-04-02

Project Overview:

The 330kV power transmission substation is located at the northwest corner of the intersection of Wenyi Road. The substation has a rectangular layout, with the main structure located underground. The roof is planned to be covered with soil with a thickness of about 1m. It is a reinforced concrete structure with three floors underground and one floor above ground, with a burial depth of about 19m. The foundation pit support adopts the reinforced concrete pile + pre-stressed jet grouting anchor cable support type. The diameter of the pile is 1.0m, and the length of a single pile is about 33 meters.

Automated monitoring equipment

Device name:Inclino-Robot IRA

Model:IRA-45

Quantity:1 Sets

Hole Depth:32m

Starting Method:Starting from the orifice

Life Cycle:2023.06-2024.02

Installation Pictures

Data Display

WX20240407-010123@2x
WX20240407-010145@2x

Monitoring data from the same measuring point in different time periods

WX20240407-010218@2x
WX20240407-010256@2x
Other Cases

Gujiaqiao foundation pit project

Automated monitoring equipmentDevice name:Incl...
Read More >>

Shanghai Chunyu Foundation Pit Project

Shanghai Chunyu Foundation Pit ProjectThe foun...
Read More >>

Southern Section Foundation Pit Project

Project Overview:The main construction content...
Read More >>

-  Contact Us -