Southern Section Foundation Pit Project

Date:2024-04-02

Project Overview:

The main construction content of the advanced section is the foundation pit of the water inlet shaft of Jiuquyang Port and the lining of the lower part of the shaft, as well as the temporary works required to complete the above projects. Among them, the lining diameter of the Jiuquyang Port water inlet shaft is 23m, the depth below the surface is 64m, the excavation diameter is about 27m, and the ground connection wall is about 74m deep.

Automated monitoring equipment

Device name:Inclino-Robot IRA

Model:IRA-100

Quantity:1set

Hole Depth:67m

Starting Method:Starting from the orifice

Life Cycle:2023.05-2024.03

Installation pictures

Data Display

WX20240407-005821@2x
WX20240407-005850@2x

Monitoring data from the same measuring point in different time periods

WX20240407-005906@2x



Other Cases

Hangzhou Convention and Exhibition Foundation Pit Project

Project Overview:The 330kV power transmission ...
Read More >>

Shanghai Chunyu Foundation Pit Project

Shanghai Chunyu Foundation Pit ProjectThe foun...
Read More >>

Shanghai Jinke Road Pit Project

Project Overview:The width of the foundation p...
Read More >>

-  Contact Us -